Home


Upcoming Events
Front to Back Office: Trading Controls and Best Practices
London, UK,
6/21/18
How to Prepare for a Ransomware Attack
Online,
6/21/18 - 6/21/18
Community Energy Conference 2018
Renold Building, Altrincham Street, The University of Manchester, Manchester, M1 7JR,
6/23/18 - 6/23/18
27th World Gas Conference 2018
Walter E. Washington Convention Centre (WEWCC), 801 Mount Vernon Place NW, Washington, DC, 20001, United States,
6/25/18 - 6/29/18
Electric Utility Cost Estimating 2018 Conference New Orleans, Louisiana
Ace Hotel New Orleans, 600 Carondelet St, New Orleans, LA, 70130, United States,
6/25/18 - 6/27/18
Submit an Event
View All Events


Sain Featured Employer

Capstone Secures Follow-On 2.4 MW FPP Long-Term Service Contracts with Key Oil & Gas Producer

 

Follow energycareer on Twitter

Sign-Up for Free Energy, Facility, Power Newsletter (EFPN) newsletter

 

 

 

Capstone Turbine Corporation (www.capstoneturbine.com) (CPST), the world's leading clean technology manufacturer of microturbine energy systems, announced that it has secured multiple significant Factory Protection Plan (FPP) aftermarket long-term service contracts as follow-on orders to the 6.9 megawatt (MW) multimillion-dollar contract signed back in early January 2018.

E-Finity Distributed Generation, Capstone’s exclusive distributor for the Mid-Atlantic and Southeastern United States and a leading power solutions provider in the Marcellus and Utica shale regions, secured the follow-on FPP aftermarket service agreements to cover a major gas producer’s growing microturbine fleet at multiple locations in the Appalachian Basin. E-Finity maintains a fleet of over 600 microturbines in continuous duty operation. These new FPP contracts cover a total of 2.4 MWs for two C200 microturbines and two C1000 systems deployed at various remote oil and gas locations, bringing the total FPP long-term service coverage with this key oil and gas producer to 9.3 MW.

Capstone’s FPP is an industry leading aftermarket service plan, delivering peace of mind, predictable maintenance costs and remote monitoring capabilities at an economical price. The all-inclusive long-term FPP contract helps ensure business continuity while normalizing maintenance costs with a simple fixed maintenance fee per year regardless of the annual scheduled or unscheduled maintenance required.

“A key component to Capstone’s growth strategy is to increase our quarterly aftermarket service revenue and expand aftermarket gross margins to the point that they cover 100% of our quarterly operating costs,” said Darren Jamison, President and Chief Executive Officer of Capstone. “The FPP attachment rates on our combined heat and power (CHP) business has historically been much higher than our oil and gas customers, but we are seeing that change as oil and gas customers see the tremendous value and peace of mind provided by our factory-backed guaranteed life cycle contracts,” added Mr. Jamison.

“Most natural gas producers in the Appalachian Basin operate in remote locations where traditional utility power is not very reliable and less economical. Capstone’s microturbines are a reliable, low emission power source that our customers rely on 24/7 to help maintain the critical natural gas infrastructure,” said Jim Bondi, Executive Vice President of E-Finity.

“Capstone continues to expand its aftermarket service offering to be more competitive in the distributed generation marketplace and is now bundling our product, accessories and service contracts to make our value proposition even more compelling to the end-use customer,” said Jeff Foster, Senior Vice President of Customer Service for Capstone.

Return Home

 

Follow energycareer on Twitter