Top Jobs
Electrical Energy Engineer
Senior Analytics Consultant
Renewables & Integrated Resource Planning Analyst
Project Manager
Project Manager
Environmental Specialist Associate
Project Engineer
Project Engineer
Program Manager
Program Technical Outreach Specialist
Submit a Position
Find a Position

Upcoming Events
SPE EOR Conference at OGWA
Oman Convention and Exhibition Centre, Al Athaiba P.C. 130 Sultanate of Oman, Muscat, Oman,
3/25/18 - 3/28/18
Introduction to Derivatives Markets, Hedging and Risk Management
Singapore, Singapore,
3/26/18 - 3/27/18
Oil Trading Orientation
Dubai, UAE,
3/26/18 - 3/28/18
8th Annual International SMR and Advanced Reactor Summit
The Westin Buckhead, 3391 Peachtree Road, N.E., Atlanta, 30326, United States,
3/27/18 - 3/28/18
SPE Workshop: Cementing Solutions That Improve Well Value
Jumeirah at Etihad Towers, PO Box 111929, Abu Dhabi, UAE,
3/27/18 - 3/28/18
Submit an Event
View All Events

Sain Featured Employer

Emerson to Install Gas Turbine Controls at ENGIE Combined-Cycle Power Plant in France


Follow energycareer on Twitter

Sign-Up for Free Energy, Facility, Power Newsletter (EFPN) newsletter




ENGIE has awarded Emerson a contract to replace legacy combustion turbine controls with Ovation turbine control technology at its DK6 800-MW combined-cycle power plant in Dunkirk, France. Existing controls on the plant's two Alstom GT13 combustion turbines are obsolete and no longer supported by the vendor.

The Ovation controls will be installed at each unit during a 13-day outage - a compressed timeframe for a turbine controls replacement project. This marks the first time a vendor other than the turbine OEM has been selected to retrofit GT13 combustion turbine controls.

"We considered different suppliers, and ultimately chose Emerson because its Ovation system met our requirements for support and maintenance over the expected 20-year life of the plant," said DK6 Plant Manager Bernard Rulmont.

Flexibility was another factor in ENGIE's decision to select Emerson, according to Rulmont.

Ovation is an open system, which gives DK6 personnel the ability to modify applications or adapt the controls to accommodate future plant expansion, as well as new operation modes and fuels - all without the need for a costly service call.

"Emerson understands the impact efficient turbine control has on achieving optimal levels of reliability and availability," said Bob Yeager, president, Power & Water, Emerson Automation Solutions. "Our Ovation technology uses the same hardware and software platform for turbine control as it uses for other plant controls, such as heat recovery steam generators, burner management systems, generator excitation and high-fidelity embedded simulation. This single platform architecture significantly reduces O&M automation-related expenses and simplifies lifecycle management and planning."

The first retrofitted power block is expected to be back online in September 2018; the second in July 2019. Emerson's comprehensive project scope includes dismantling the existing controls, engineering and installing the new controls, and assisting with commissioning and startup.

Return Home


Follow energycareer on Twitter