|
Energy |
|
|
Refers to generating capacity which is left online after the day's peak demand period ends so that it is available to meet the following day's demand. Next-day system requirement is calculated as a percentage of system swing load (the difference between peak and baseload demands on a given day).
See also:
capacity, load day-ahead market, system swing load, peak demand, baseload demand